Crouch Waterfall Projects

READING WEST STATION

Crouch Waterfall were engaged by J Murphy & Sons for the permanent works design of a footbridge replacement scheme at Reading West Station. The works were proposed in order to accommodate overhead electrification and formed part of the Great Western… Continue reading “READING WEST STATION”

Wymington Footbridge

Wymington footbridge was identified as requiring parapet extension (in height). It is a standard LM type steel footbridge with 1.55m high steel parapets, lower than the required height (1.85m) or protection for the electrification lines. Crouch Waterfall were engaged by… Continue reading “Wymington Footbridge”

RYE HARBOUR

Crouch Waterfall designed temporary works for Jackson Civil Engineering (JCE) in the construction of a 1.3km long replacement sheet piled river training wall at Rye Harbour in East Sussex. The sheet pile retaining wall retains beach material on the west… Continue reading “RYE HARBOUR”

ADAMSDOWN FOOTBRIDGE

Located approximately one kilometre east of Cardiff Central Station Adamsdown Footbridge carries a public footpath, on 3-spans, over the South Wales Main Line and the Bute Dock Branch line as well as Adamsdown Lane. The superstructure, reconstructed in 1951, consists… Continue reading “ADAMSDOWN FOOTBRIDGE”