Crouch Waterfall Rail

Scorrier Mine Capping

  The site at Scorrier is in a known historic miningĀ area over which a railway was constructed. As a result of a number of historic surface collapses and surface subsidence, the existing rail-line was subject to periodic monitoring, and a… Continue reading “Scorrier Mine Capping”

Newport Station

Crouch Waterfall was engaged by ABC Electrification to undertake the temporary works for the electrification works at Newport Station. Working included temporary footings, a service bridge, excavation support, propping and a number of crane lifts. The most significant lift being… Continue reading “Newport Station”

Tir Phil Station

Crouch Waterfall was approached by Balfour Beatty to support them in their design and build of the station improvement works at Tir Phil, located within the welsh valleys. As part of a suite of station improvement works, both platforms are… Continue reading “Tir Phil Station”

Chislehurst Road Bridge

Chislehurst Road Bridge carries the A208 between Chislehurst and Orpington in Kent. The existing post tensioned, reinforced concrete bridge was to be replaced by a new steel plate girder bridge. Located over four lines of busy railway meant construction and… Continue reading “Chislehurst Road Bridge”

Kings Cross

  Crouch Waterfall provided temporary works designs to allow Kier Construction to carryout extensive refurbishment and station improvement works. As much of the station is a listed building, temporary works design had to be sympathetic to this and hence the… Continue reading “Kings Cross”