Crouch Waterfall Projects

Rye Harbour

Crouch Waterfall designed temporary works for Jackson Civil Engineering (JCE) in the construction of a 1.3km long replacement sheet piled river training wall at Rye Harbour in East Sussex.  The sheet pile retaining wall retains beach material on the west… Continue reading “Rye Harbour”

St Johns School

The construction of new sportshall, media centre and classrooms at St. John’s School & Community College was constructed by ISG at a project cost of approximately £18.6m.  Construction of five blocks interlinked with walkways, a new entrance road and coach… Continue reading “St Johns School”

Hayesfield School

Crouch Waterfall provided temporary works designs to allow ISG Pearce to construct new school buildings at Hayesfield School in Bath. Close coordination with the site team was required to enable the temporary works and main construction programme to progress in… Continue reading “Hayesfield School”

Chislehurst Road Bridge

Chislehurst Road Bridge carries the A208 between Chislehurst and Orpington in Kent. The existing post tensioned, reinforced concrete bridge was to be replaced by a new steel plate girder bridge. Located over four lines of busy railway meant construction and… Continue reading “Chislehurst Road Bridge”

Kings Cross

  Crouch Waterfall provided temporary works designs to allow Kier Construction to carryout extensive refurbishment and station improvement works. As much of the station is a listed building, temporary works design had to be sympathetic to this and hence the… Continue reading “Kings Cross”