Crouch Waterfall Permanent Works

PRESTON STATION

  In 2019, Crouch Waterfall were engaged by MPH Construction to undertake the design for facilitating a replacement glazing system to the gable end of Preston Station’s train shed. Working with Twinfix, who provided the proprietary glazing system, Crouch Waterfall… Continue reading “PRESTON STATION”

Cuckoo Bridge

Completed in 2017, the new bridge at Cuckoo forms part of the Great Western Electrification programme and facilitates the installation of overhead electrified wires through the area by the removal and reconstruction on the same footprint of the overline road… Continue reading “Cuckoo Bridge”

Scorrier Mine Capping

  The site at Scorrier is in a known historic mining area over which a railway was constructed. As a result of a number of historic surface collapses and surface subsidence, the existing rail-line was subject to periodic monitoring, and a… Continue reading “Scorrier Mine Capping”