Crouch Waterfall Geotechnical & Geoevironmental

Tir Phil Station

Crouch Waterfall was approached by Balfour Beatty to support them in their design and build of the station improvement works at Tir Phil, located within the welsh valleys. As part of a suite of station improvement works, both platforms are… Continue reading “Tir Phil Station”

River Sherway

Crouch Waterfall carried out feasibility studies for the provision of a new steel sheet piled retaining wall in front of an existing timber structure supporting land next to the railway. The retained height was some 3m. As part of these… Continue reading “River Sherway”

Rye Harbour

Crouch Waterfall designed temporary works for Jackson Civil Engineering (JCE) in the construction of a 1.3km long replacement sheet piled river training wall at Rye Harbour in East Sussex.  The sheet pile retaining wall retains beach material on the west… Continue reading “Rye Harbour”