Gloucester AFA
The lifting-in of a new Access for All Footbridge span at Gloucester Railway Station was carried out successfully in the early part of June 2012. Crouch Waterfall provided the contractor Murphy with full design services under a Design & Build contract through Network Rail GRIP stages 4 to 6.


