Newport Bridge Street bridge

The Bristol office have just completed works for the existing Bridge Street bridge over the South Wales main line to the South of Newport station being demolished as part of the GWRM Electrification Programme. The main structure of the bridge was lifted out using a Liebherr LR1600-2 crawler crane on steel crane mats installed in Godfrey Road car park which were designed by Crouch Waterfall’s geotechnical department.