Bynea Road Bridge replacement
In order to replace an existing bridge deck over the LLA railway line an additional embankment was designed to widen the road platform so that the crane used for the lift could gain access, be safely founded and carry out the works. The design involved assessing of existing ground conditions, back analysing the stability of the existing slope, bearing capacity analysis for the foundations of the crane and also earthworks and slope stability analysis of the new embankment. These works were undertaken in February 2016 for Alun Griffiths Ltd.