Crouch Waterfall Temporary Works & Demolition

BERW BRIDGE, PONTYPRIDD

In 2022 to 2023 Crouch Waterfall, working for the concrete repair contractor Concrete Repairs Limited (CRL), assessed the historic reinforced concrete bridge at Berw Road, Pontypridd for various proposed temporary loadcase and refurbishment case conditions.  The road bridge over the… Continue reading “BERW BRIDGE, PONTYPRIDD”

Scorrier Mine Capping

  The site at Scorrier is in a known historic mining area over which a railway was constructed. As a result of a number of historic surface collapses and surface subsidence, the existing rail-line was subject to periodic monitoring, and a… Continue reading “Scorrier Mine Capping”

Newport Station

Crouch Waterfall was engaged by ABC Electrification to undertake the temporary works for the electrification works at Newport Station. Working included temporary footings, a service bridge, excavation support, propping and a number of crane lifts. The most significant lift being… Continue reading “Newport Station”